Construction of Transmission Line 66 KV

Client

Huadong Engineering Corporation

Year period

August 2017 - April 2018

Service type

Construction

Status

Completed

Construction of Transmission Line 66 KV

Electricity generated by the geothermal power plant will be transmitted through a transmission line constructed across the existing PLN electricity distribution corridor. Supraco contributes by providing construction services to ensure the facility is completed and ready for reliable power delivery.

Scope of Work:

  • Foundation works for the 66 kV transmission line
  • Tower erection for the 66 kV transmission line
  • Conductor stringing for the 66 kV transmission line
  • Construction of 16 double-circuit towers for the Sorik Merapi Geothermal Power Plant, including foundation works, tower erection, conductor stringing, grounding installation, installation of accessories, and electrical testing and commissioning (e.g., tension, torque, verticality, clamp inspection, insulation resistance, etc.).